November 2024
Key sustainability achievements include:
- Deploying a carbon-neutral Welfare Support Unit powered by solar panels with 100% rainwater harvesting
- Transitioning site plant and machinery to Hydrotreated Vegetable Oil (HVO), reducing carbon emissions by 90%
- Implementing electric reinstatement tools to minimise local carbon and noise emissions
- Recycling excavated soil on-site to reduce material transportation
- Utilising a trench cutter to decrease fuel consumption by 80% and operational machinery time
The project demonstrates a strong commitment to supporting the Government's net zero objectives before 2050, showcasing innovative environmental solutions in infrastructure development.